
Eco Foundations installs King Post Retaining Wall in Huthwaite, Nottinghamshire for client PDR Construction. The H piles were concreted into 600 mm diameter holes 7 m deep through Mudstone for a retained height of 3 m using a high powered CFA piling rig.