6 Oct 2008, 3:12 PM
UK piling contractor Eco Foundations installs retaining walls for new swimming pool in Wimbledon, south west London.
The retaining wall was designed by Eco Foundations and installed using a CFA piling rig drilling diameters of 600 mm and 450 mm as a contiguous piled wall. Some 120 piles were installed to a max depth of 18 m over a 2 week period.